New document
Fill in what applies. Leave contract items empty to issue a survey report instead of a priced proposal. Everything saves to the register as you go.
01Client & Propertyhide
02Findings & Observationshide
03Photograph Schedulehide
Six per page, two across and three down. Photos are shrunk before upload. Number is the order shown; use the arrows to reorder. Caption is two lines at most.
04Recommendations & Specificationshide
05Estimatorhide
Each assembly is costed from the rate card: crew-days at the day rate, materials by area and thickness, then doubled for 50% margin. Third-party supply is cost plus 20%. There is no automatic set-up allowance; the metre rates carry it. Add skips or a custom waste charge as their own lines. Override a sell price if you must, and say why.
06Rate Cardshow
07Other Contract Itemshide
Contract sell ex VAT£0
Cost£0
Gross profit£0
GP %0%
Use this for items that are not costed by the estimator, such as the survey fee credit or a fixed-price extra. Costs never appear on the client page.
08Additional Options (not in contract value)hide
Shown as priced options the client can tick at acceptance. Not included in the contract total.
09Payment & Programmehide
Commencement is calculated as 50 minus deposit. We never take more than 50% before completion.